Question: An assembly line requires two components: gadits and widits. Gadjits are produced by center 1 and widjits are produced by center 2. Each unit of
An assembly line requires two components: gadits and widits. Gadjits are produced by center 1 and widjits are produced by center 2. Each unit of the end item, called a jit-together, requires 3 gadjits and 2 widjits. The daily production quota on the assembly line is 775 it-togethers. The container for gadjits holds 90 units. The policy variable for center 1 is set at 0.06. The average waiting time for a container of gadjits is 0.08 day, and 0.05 day is needed to produce a container. The container for widits holds 60 units, and the policy variable for center 2 is 0.04. The average waiting per container of widits is 0.15 day. and the time required to process a container is 0.16 day. a. How many containers are needed for gadjits? (Enter your response rounded up to the next whole number) B. How ma au constrained are needed for widjits? (Enter your response rounded up to the next whole number)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
