Question: An assembly line with 14 tasks is to be balanced. The longest task takes 7.1 minutes to complete, and the total time for all tasks
An assembly line with 14 tasks is to be balanced.
The longest task takes 7.1 minutes to complete, and the total time for all tasks is 24.5 minutes. The line operates 460 minutes per day.
What is the minimum cycle time in this configuration?
(Your answer should be in minutes and contain one decimal place)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts