Question: An assembly line with 18 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18

An assembly line with 18 tasks is to be balanced.An assembly line with 18 tasks is to be balanced.An assembly line with 18 tasks is to be balanced.

An assembly line with 18 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 442 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.) minutes Minimum cycle time Maximum cycle time minutes b. What are the daily minimum and maximum output rates theoretically possible for the line? (Round your answers to whole numbers.) b. What are the daily minimum and maximum output rates theoretically possible for the line? (Round your answers to whole numbers.) Minimum output Maximum output c. What is the minimum number of workstations needed if the maximum output rate is to be sought (set maximum output rate as the desired output rate)? (Round your answer up to a whole number.) Minimum number of workstations d. What cycle time will provide an output rate of 132 units per day? (Round your answer to 1 decimal place.) Cycle time minutes per cycle e. What output potential will result for the following cycle times? (Round your answers to whole numbers.) 9 minutes 15 minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!