Question: An earthmoving operation has available one loader with a 7 - cy heaped capacity bucket for filling 4 5 . 9 - cy heaped capacity
An earthmoving operation has available one loader with a cy heaped capacity bucket for filling cy heaped capacity offroad trucks. All equipment operates at min hours. The loader produces a bucket fill factor of and truck fill factor is Loaders do not "short load." Loader cycle time is min no travel Truck dump time is min includes maneuvering, dumping and turning The loaded trucks climb uphill through the following three sections and return empty downhill through the same sections. Trucks operate at rated load and empty weights.
Calculate the number of cycles per loader to fill each truck.
Calculate the number of trucks requied for each loader.
Based on the number of trucks you determine, develop a curve for the $cy production cost vs trucks curve for a range of trucks. Use the following hourly rates including operator for each piece of equipment:
cy capacity loader $hr
cy off road truck $hr
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock