Question: An earthmoving operation has available one loader with a 7 - cy heaped capacity bucket for filling 4 5 . 9 - cy heaped capacity

An earthmoving operation has available one loader with a 7-cy heaped capacity bucket for filling 45.9-cy heaped capacity off-road trucks. All equipment operates at 50-min hours. The loader produces a bucket fill factor of 90%, and truck fill factor is 100%. Loaders do not "short load." Loader cycle time is 0.6 min (no travel). Truck dump time is 0.5min (includes maneuvering, dumping and turning). The loaded trucks climb uphill through the following three sections and return empty downhill through the same sections. Trucks operate at rated load and empty weights.
Calculate the number of cycles per loader to fill each truck.
Calculate the number of trucks requied for each loader.
Based on the number of trucks you determine, develop a curve for the $/cy production cost vs. trucks curve for a range of +/-2 trucks. Use the following hourly rates (including operator) for each piece of equipment:
7-cy capacity loader $175/hr
45.9-cy off road truck $180/hr.
An earthmoving operation has available one loader

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!