Question: An engineering project is being planned use Project Network Techniques, and the precedence diagram attached as figure 1 has been prepared to show the sequence

An engineering project is being planned use Project Network Techniques, and the precedence diagram attached as figure 1 has been prepared to show the sequence of logic . the duration of each activity is shown in the standard position , quoted in weeks .
a) Complete the precedence diagram by adding to full analysis of start and finish times (EST, BET, LST.
LFT) and local in the appropriate place. decide the Total Project time. (20 pes)
b) indicate the critical path on the diagram, explain your decision, why? explain the importance of the critical path.
B) By using the information given in Figure 1, prepare, a table indicating activity name, duration and
predaceous for each activity. Draw Activity on-Arrow (A-o-A): (20 pos)(Use the empty places, no extra answer paper) figure 1.
precedence Diagram
Start
2
4
4
10
60
90
13|
100
2
6
80
30
|3|
-50
6
6
20
70
40
2
ANSWER. i need correct answer please
An engineering project is being planned use

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!