Question: An existing 6 m deep bio tower cannot meet the effluent standard of less than 1 0 m g L . The plant influent BOD
An existing deep bio tower cannot meet the effluent standard of less than
The plant influent BOD is the primary effluent BOD is the plant
final effluent is and the recirculation ratio is of the wastewater flow
entering the plant. One proposal is to change the recirculation ratio, to reduce the
effluent BOD from to The constants for the random plastic media, is
and is Design temperature is
a Calculate the hydraulic loading
b By using the recirculation ratio check whether the plant effluent meet the
standard
c What recirculation should we have to maintain to meet the standard
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock