Question: An NEC 4 Engineering and Construction Contract includes Option X 7 , X 1 5 and X 1 8 . Which TWO of the following
An NEC Engineering and Construction Contract includes Option X X and X Which TWO of the following statements are NOT correct?Select TWO options A The Contractors liability owed to the Client for indirect or consequential loss is limited to the amount stated in Contract Data B Amounts for delay damages are excluded from the Contractor's total limit liability owed to the Client C The Contractor is not liable for a Defect which arose from its design unless it failed to carry out that design using reasonable skill and care D The Contractor is not liable for a Defect which arose from its design if the design was submitted to and accepted by the Project Manager E The Contractor is not liable for a matter notified to the Contractor after the defects date
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock