Question: An operator working at a saw machine is responsible to measure the length of the 5 th part after a machine is set up so

An operator working at a saw machine is responsible to measure the length of the 5th part after a machine is set up so he can verify that the machine was set up correctly and is cutting the part at the middle of the specification range.
The onerator uses 8 ca brater ennth neueo mesure . sres mes
recetanty of 0.15 of the reading and folows a normal protality distribution, The Lengi auge resoluton 150.01
uncertainty or u.1 or the readine and tollows a normal probably distribution, Ine Lenech cause resclution is O.us and follows a rectangular (uniform) distribution. The following are the part measurements in mm:
60.06
Average: 60.00
1) What is the Standard Uncertainty of the Mean? Enter your answer in Blank #1 with 4 decimal places. Please do not enter units.
2) What is the Resolution standard uncertainty? Enter your answer in Blank #2 with 4 decimal places. Please do not enter units.
3) What is the Calibration standard uncertainty? Enter your answer in Blank #3 with 4 decimal places. Please do not enter units.
4) What is the resulting combined standard uncertainty (u)? Enter your answer in Blank #4 with 4 decimal places. Please do not enter units.
5) What is the Expanded uncertainty at a 95% confidence level? Enter your answer in Blank #5 with 2 decimal places. Please do not enter units.
6) Express the measurand and the uncertainty based on the calculated expanded uncertainty at a 95% confidence level. Enter your answer in Blank #6. Make suretoenterunits.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!