Question: An order for 300 units is processed on work station A. The set-up time is 40 minutes and the run time per units is 10
An order for 300 units is processed on work station A. The set-up time is 40 minutes and the run time per units is 10 minutes. This is a rush order so we decided to split the order and run it on two machines within the work center. Both machines can be set up simultaneously. Calculate the following:
- What is the lead time if the entire order of 300 units is processed on a single machine? (2 points)
- What is the lead time if the order is split and the two machines run simultaneously? (2 points)
- What is the lead time reduction due to splitting the order? (1 point)
- What would the lead time reduction be if the second machine could not be set up until after the set-up of the first machine was complete? (1 point)
.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts