Question: Analytics Exercise: Designing a Manufacturing Process Toshiba's Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is examining the prototype assembly process sheet (shown




Analytics Exercise: Designing a Manufacturing Process Toshiba's Notebook Computer Assembly Line Toshihiro Nakamura, manufacturing engineering section manager, is examining the prototype assembly process sheet (shown in Exhibit 8.15) for the newest subnotebook computer model. With every new model introduced, management felt that the assembly line had to increase productivity and lower costs, usually resulting in changes to the assembly process. When a new model is designed, considerable attention is directed toward reducing the number of components and simplifying parts production and assembly requirements. This new computer was a marvel of high-tech, low-cost innovation and should give Toshiba an advantage during the upcoming fall winter selling season. Production of the subnotebook is scheduled to begin in 10 days. Initial production for the new model is to be 150 units per day, increasing to 250 units per day the following week (management thought that eventually production would reach 300 units per day). Assembly lines at the plant normally are staffed by 10 operators who work at a 14.4-meter-long assembly line. The line is organized in a straight line with workers shoulder to shoulder on one side. The line can accommodate up to 12 operators if there is a need. The line normally operates for 7.5 hours a day (employees work from 8:15 A.M. to 5:00 P.M. and regular hours includes one hour of unpaid lunch and 15 minutes of scheduled breaks). It is possible to run one, two, or three hours of overtime, but employees need at least three days' notice for planning purposes. The Assembly Line At the head of the assembly line, a computer displays the daily production schedule, consisting of a list of model types and corresponding lot sizes scheduled to be assembled on the line. The models are simple variations of hard disk size, memory, and battery power. A typical production schedule includes seven or eight model types in lot sizes varying from 10 to 100 units. The models are assembled sequentially: All the units of the first model are assembled, followed by all the units of the second, and so on. This computer screen also indicates how far along the assembly line is in completing its daily schedule , which serves as a guide for the material handlers who supply parts to the assembly lines. The daily schedules are shared with the nearby Fujihashi Parts Collection and Distribution Center. Parts are brought from Fujihashi to the plant within two hours of when they are needed. The material supply system is very tightly coordinated and works well. exhibit 8.15 Notebook Computer Assembly Process Sheet Task Task Time (Seconds) Tasks That Must Precede This Task 1. Assemble Cover 75 None 2 Install LCD in Cover 61 Task 1 3. Prepare Base Assembly 24 None 4. Install M-PCB in Base 38 Task 3 5. Install CPU 22 Task 4 6. Install Backup Batteries and Test 30 Task 4 7. Install Acoupoint Pointing Device and Wrist Rest 32 Task 4 8. Install Speaker and Microphone 44 Task 4 9. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB 29 Task 4 10. Prepare and Install Keyboard 28 Task 11. Prepare and Install Digital Video Drive (DVD) and Hard Disk Drive (HDD) 52 Task 10 12. Install Battery Pack 7 Task 11 13. Insert Memory Card 5 Task 12 14. Start Software Load 11 Tasks 2.5.6.7.8.13 15. Software Load labor not required) 310 Task 14 18. Test Video Display 60 Task 15 17. Test Keyboard 60 Task 10 exhibit 8.16 Engineers Initial Design of the Assembly Line Tasks Workstation Number Assembly-Line Position 1 Labor Time (seconds) 75 1 1. Assemble Cover (75) 2 2 61 + 24 = 85 2. Install LCD in Cover (61) 3. Prepare Base Assembly (24) 3 3 36 +22 -39 = 97 4. Install Main Printed Circuit Board (M-PCB) in Base (36) 5. Install CPU (22) 6. Install Backup Batteries and Test (39) 4 4 32 + 44 - 29 = 105 7. Install Accupoint Pointing Device and Wrist Rest (32) 8. Install Speaker and Microphone (44) 9. Install Auxiliary Printed Circuit Board (A-PCB) on M-PCB (29) 5 5 26 +52 +7 +5+ 11 = 101 10. Prepare and Install Keyboard (26) 11. Prepare and Install Digital Video Drive (DVD) and Hard Disk Drive (HDD) (52) 12. Install Battery Pack 13. Insert Memory Card (5) 14. Start Software Load (11) 15. Software Load (19) 6 Software Load (120) Software Load (120) 7 8 Software Load (51) 9 6 60 - 60 = 120 16. Test Video Display (60) 17. Test Keyboard (60) 10 Empty 11 Empty 12 Empty Workstation 5: Here tasks are performed in a sequence. First, the keyboard is installed, followed by the DVD and hard disk drive (HDD). The battery pack is then installed, followed by the memory card. The computer is then powered up and a program started that loads software that can be used to test the computer. Actually loading the software takes 310 seconds, and this is done while the computer travels through positions 6, 7, and 8 on the assembly line. Computers that do not work are sent to a rework area where they are fixed. Only about 1 percent of the computers fail to start, and these are usually quickly repaired by the supporter. Workstation 6: The video display and keyboard are tested in this workstation. After assembly, the computers are moved to a separate burn-in area that is separate from the assembly line. Here, computers are put in racks for a 24-hour. 25C burn-in" of the circuit components. After burn-in, the computer is tested again, software is installed, and the finished notebook computer is packaged and placed on pallets for shipment to Toshiba distribution centers around the world. Tweaking the Initial Assembly-Line Design From past experience, Toshihiro has found that the initial assembly-line design supplied by the engineers often needs to be tweaked. Consider the following questions that Toshihiro is considering: 1. What is the daily capacity of the assembly-line designed by the engineers? Assume that the assembly line has a computer at every position when it is started at the beginning of the day. 2. The line designed by the engineers is running at maximum capacity. What is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations. 3. How should the line be redesigned to operate at the initial 250 units per day target, assuming that no overtime will be used? What is the efficiency of your new design relative to its use of labor? 6. What other issues might Toshihiro consider when bringing the new assembly line up to speed