Question: Angela is evaluating a new salt process delivery system and wants to know if the upper and lower control limits at 3 standard deviations for
Angela is evaluating a new salt process delivery system and wants to know if the upper and lower control limits at 3 standard deviations for the new system will meet the upper and lower controls specifications currently used (2.22 and 1.98). The population standard deviation is s = .07 and each sample is n=4. Are the numbers in bold correct, What are the new set limits
| Current Set Limits | ||||||||
| x1 | x2 | x3 | x4 | X | UCL | LCL | ||
| Sample 1 | 1.98 | 2.11 | 2.15 | 2.06 | 2.075 | 2.08 | 2.22 | 1.98 |
| Sample 2 | 1.99 | 2.00 | 2.08 | 1.99 | 2.015 | 2.02 | ||
| Sample 3 | 2.20 | 2.10 | 2.20 | 2.05 | 2.1375 | 2.14 | New Process Limits | |
| Sample 4 | 2.18 | 2.01 | 2.23 | 1.98 | 2.1 | 2.10 | UCL | LCL |
| Sample 5 | 2.01 | 2.08 | 2.14 | 2.16 | 2.0975 | 2.10 | ||
| 2.085 | 2.09 |
| ||||||