Question: answer 5.3 98 Chapter 5 Q5.3 (Setup Everywhere) Consider the following batch-flow process consisting of three process steps performed by three machines Step 1 Step
answer 5.3
98 Chapter 5 Q5.3 (Setup Everywhere) Consider the following batch-flow process consisting of three process steps performed by three machines Step 1 Step 2 Step 3 Activity Time: 0.25 Minute/Part Setup Time: 30 Minutes Activity Time: 0.20 Minute/Part Setup Time: 20 Minutes Activity Time: 0.15 Minuto/Part Setup Time: 45 Minutes Work is processed in batches at each step. Before a batch is processed at a step, the ma- chine at that step must be set up (During a setup, the machine is unable to process any prod- uct.) Assume that there is a dedicated setup operator for each machine (i.c., there is always someone available to perform a setup at each machine.) a. What is the capacity of step 1 if the batch size is 35 parts? b. For what batch sizes is step 1 (2, 3) the bottleneck? 93,75%
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
