Question: Answer all questions in this section ( 2 0 marks ) Risk must be considered in the phase and weighed against the potential benefit of
Answer all questions in this section
marks
Risk must be considered in the phase and weighed against the potential benefit of the project's success in order to decide if the project should be chosen.
a completion
b execution
c planning
d Initiation
Adoboli is looking at a document that outlines the specific tasks and subtasks required to complete the writing of a technical support manual. The method that was probably used to develop the document is most likely
a Responsibility matrix
b Organization breakdown structure
c Work breakdown structure
d Priority matrix
To design and develop a student forum mobile app within five months at costs not to exceed is best classified as
a A deliverable
b A milestone
c An objective
d A limit
When classifying and ranking projects, which of the following refers to the extent to which the project is viewed as helping the organization achieve its strategic objectives and longterm goals?
a Resource availability
b Business placement
c Strategic alignment
d Potential benefits
A good starting point for developing time and cost estimates is
a Past experience
b Work packages
c Task analysis
d Time and motion studies
Specialization is a feature of which organizational structure?
a Matrix
b Divisional
c Multi Divisional
d Functional
Which of the following represents a project, specifically?
a Manufacturing automobiles at the Kia plant
b Assembling several complex drones in a production plant using robotics
c Utilizing robotics to lift heavy packages at a UPS distribution plant during the busy holiday season
d Inventing a new prototype for a drone
What is the main advantage of using the NPV method as a basis for project selection?
a It takes into account the time value of money.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
