Question: Answer all questions The project to build a ship that you are supervising is not progressing well. You were notified by the quality lead that
Answer all questions
The project to build a ship that you are supervising is not progressing well. You were notified by the quality lead that the system design team has to redesign the ship due to poor quality and significant shortcomings in the design. In addition, during a walkthrough inspection, you discovered that a considerable amount of scrap material has been generated by a team of newly hired engineers. The scrap material and rework are examples of:
Group of answer choices
Cost of conformance
External failure
Prevention costs
Internal failure
2)
As a project manager, you are trying to decide the trade-offs between quality and grade in your project. Which one of the following is correct with respect to a product developed or a service performed?
Group of answer choices
Low quality is acceptable, but low grade is not.
There is no difference between quality and grade.
Neither low grade nor low quality is acceptable.
Low quality is not acceptable, but low grade is.
3)
A plastic molding workshop wants to reduce injection molding rejects and performs a set of experiments that change injection pressure, mix, temperature, and setting times. Analysis of the results shows a combination of temperature and setting times as the most significant factors. Which of the following techniques is being used?
Group of answer choices
Statistical sampling
Design of experiments
Brainstorming
Nominal group technique
4)
Proprietary quality management methodologies are used as tools & techniques in which of the following quality processes?
Group of answer choices
Manage Quality
Perform Quality Management
Control Quality
Plan Quality Management
5)
You are in the Plan Resource Management process of identifying and documenting project roles, responsibilities, required skills, competencies, reporting structure, and other items. Which one of the following will you NOT use as a tool & technique in this process?
Group of answer choices
A responsibility assignment matrix
Hierarchical-type charts
Recognition and rewards
Organizational theory
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts