Question: ANSWER ALL THESE RIGHT An advantage to designing a project to be LEEDS certified and obtaining that certification is: (M.C.) A. Lower initial project cost
ANSWER ALL THESE RIGHT
An advantage to designing a project to be LEEDS certified and obtaining that certification is: (M.C.) A. Lower initial project cost B. Free energy efficient products and materials C. Lower energy costs in long-term use of the project D. All of the above ___2 LEED construction projects cost are usually more so they cannot be used on PUBLIC projects. (T/F) (Place answer on blank near number) 3 What PHASE of the LEED construction project should START in?? ________________________ (FILL IN) 4-5 LEED v4 newest version improves the overall project experience related to these areas .LIST THREE (FILL IN) A. __________________________ B. __________________________________ C _____________________________ ___ 6 This is a benefit of a Green building (M.C.) A. Lower Utilities Cost B. Increase Building Value C. Resource Savings D. All of the Above ____ 7 USGBC wants LEEDS to v4 : (M C.) A. Reverse contribution to Global climate Change B. Enhance Individual Human Health C. Promote Sustainability D. All of the Above
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
