Question: Answer any three ( 3 ) questions Part A [ 1 5 marks ] Ready Homes Inc. manufactures and assembles prefabricated Steel and Concrete Structures
Answer any three questions
Part A marks
Ready Homes Inc. manufactures and assembles prefabricated Steel and Concrete Structures which are used for the construction of starter Homes. There are three support departments and two production departments. The budgeted costs and the normal activity levels for each department are given below.
tableSupport Departments,,,tableDesign andPersonneltableFabrication& assemblyInstallationProduction Departments,,Overhead costs,$$$Square feet,tableNumber ofemployeesMaterial Cost,$$$$tableTotal productionin square metersDirect labor cost,,,,,,
The allocation bases are as follows: Design Number of Employees; for Fabrication Square feet and for Installation Material costs. The production department allocates overhear cost to each case based on the budgeted cases produced for each product.
Required
Using the Stepdown method, allocate the Design and personnel cost.
Marks
Set up the equations that should be solved if the reciprocal method is used to allocate the tworemaining support department cost to the production departments. Marks
Determine the total cost per square meter using the reciprocal method of support cost allocation.
Marks
TURN OVER
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock