Question: ANSWER ASAP PLEASE, AND I NEED ALL THE ANSWER IN THE BOX (40 points) Airwaves Inc. has received an order for 100020 -inch fans due


ANSWER ASAP PLEASE, AND I NEED ALL THE ANSWER IN THE BOX
(40 points) Airwaves Inc. has received an order for 100020 -inch fans due week 7. Each fan consists of a housing assembly, two grills, a fan assembly, and an electrical unit. The housing assembly consists of a frame, two supports, and a handle. The fan assembly consists of a hub and five blades. The electrical unit consists of a motor, a switch, and a knob. The following table gives the lead times, and on-hand inventory. a. Draw the product structure. (Use the letters to indicate components) and determine the number of units of each item required to satisfy the demand for the order of 1000 fans. In other words "Explode" the requirements. (10 points) b. Draw the time-phased product structure. (5 points) c. Build the gross requirements plan. (Use spread sheet) (10 points) d. Redraw the product structure and explode the "net requirements". (5 points) e. Fill out the net requirements. (Use spread sheet). (10 points) GROSS REQUIREMENTS PLAN WEEK LEAD TIME Item
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts