Question: answer bith please ROP=dLT+SS=dLT+zLT2d2+e2LT When analyzing Re-Order Point(ROP) using the same formula above (ROP formula). If lead time is constant and demand is variable, you

answer bith please
answer bith please ROP=dLT+SS=dLT+zLT2d2+e2LT
ROP=dLT+SS=dLT+zLT2d2+e2LT When analyzing Re-Order Point(ROP) using the same formula above (ROP formula). If lead time is constant and demand is variable, you will plug in the value of zero (0) in which of the following parameter? standard deviation of lead time standard deviation of demand average demand average lead time Question 3 3 pts ROP=dLT+SS=dLT+zLT2d2+d2LT When analyzing Re-Order Point(ROP) using the same formula (ROP formula), If lead time and demand are both variable (i.e. not constant). you will plug in the value of zero (0) in which of the following parameter? average demand standard deviation of demand standard deviation of lead time None of the above

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!