Question: Answer correctly a, b and c for a thumbs up. 2. Let us assume that you need to produce and ship 1,500 units of a

Answer correctly a, b and c for a thumbs up. 2.

Answer correctly a, b and c for a thumbs up.

2. Let us assume that you need to produce and ship 1,500 units of a product on a 8-hour shift. They use 30 minutes for lunch and 10 minutes breaks in the morning and afternoon, respectively. For purposes of operational efficiency, there is a consistent loss in terms of cycle time of a 5% (e.g., if the process lead time for the overall process is 5 seconds, you are working on 5.25 seconds). a. Calculate the takt time required to satisfy demand. Takt-Time= Available Time Demand b. What does this takt time means for this case? C. How many units per hours are required to be manufactured? d. What is the takt time for a component that is required at a rate of three components per final product

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!