Question: ANSWER IN MATLAB: The volume in the pilot plant feed tank ( B - 0 1 ) must be kept above 7 5 L so

ANSWER IN MATLAB: The volume in the pilot plant feed tank (B-01) must be kept above 75 L so that the pump (P-01) never runs dry.
a) Use a method of your choosing to integrate the flow data through sensor FT02 in the second run as a
function of time. If you were unable to extract the run 2 data in Q2, you may import the FT02 data for run
2 from FT02_run_2.csv in order to complete this question. On Figure 4, plot the cumulative volume
versus time on a figure as a blue line, with time units in minutes from the beginning of run 2 on the x-axis.
b) Identify the range of flow data around the value of 75L that could be accurately described by a linear
relation. Fit a linear regression to this subset of the data and plot the line you obtain on Figure 4 in red with
line thickness of 3. Print to the command window the coefficient of determination (R
2
) for your regression
line and a comment on the goodness of fit of the real data to the regression model.
Note: visual inspection of the flow rate values through FT02 should help you identify
the appropriate range of data for the relation.
c) Use the linear relation you obtained in part b) to identify the time in minutes from the beginning of
run 2 that a total volume of 75L has flowed into the permeate tank. Plot this as a purple diamond with
marker size 10 on Figure 4. Q3.
The volume in the pilot plant feed tank (B-01) must be kept above 75L so that the pump (P-01) never runs dry.
a) Use a method of your choosing to integrate the flow data through sensor FT02 in the second run as a
function of time. If you were unable to extract the run 2 data in Q2, you may import the FT02 data for run
2 from "FT02_run_2.csv" in order to complete this question. On Figure 4, plot the cumulative volume
versus time on a figure as a blue line, with time units in minutes from the beginning of run 2 on the x-axis.
b) Identify the range of flow data around the value of 75L that could be accurately described by a linear
relation. Fit a linear regression to this subset of the data and plot the line you obtain on Figure 4 in red with
line thickness of 3. Print to the command window the coefficient of determination (R2) for your regression
line and a comment on the goodness of fit of the real data to the regression model.
Note: visual inspection of the flow rate values through FT02 should help you identify
the appropriate range of data for the relation.
c) Use the linear relation you obtained in part b) to identify the time in minutes from the beginning of
run 2 that a total volume of 75L has flowed into the permeate tank. Plot this as a purple diamond with
marker size 10 on Figure 4.
 ANSWER IN MATLAB: The volume in the pilot plant feed tank

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!