Question: answer is in blackQ 3 : It has been decided to sidetrack a well from 1 5 0 0 f t . The sidetrack will

answer is in blackQ3:
It has been decided to sidetrack a well from 1500ft. The sidetrack will be an S-shape profile with
the following specifications:
Target Coordinates:
Surface Coordinates:
TVD of Bottom of Hole:
Build up Rate:
Drop off rate:
1300ftE&-1600ftN
-2300ftE&1000ftN
12000ft.
1.5 per 100ft.
2.5 per 100ft
Calculate the following:
a) Total departure and azimuth
b) Drift angle of the well.
c) TVD, MD, and horizontal departure at the end of buildup section
d) MD and horizontal departure at the TVD midpoint of buildup section
e) TVD, MD, and horizontal departure at the end of tangent section
f) TVD and horizontal departure at the midpoint MD of tangent section
g) MD and horizontal departure at the TVD midpoint of drop off section
h) Total measured depth to the target.
answer is in blackQ 3 : It has been decided to

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!