Question: answer part a and b use this formula for part b for part b: assume that the availble time is 480 minutes. Given the figure

answer part a and b
use this formula for part b
for part b: assume that the availble time is 480 minutes. answer part a and b use this formula for part b for
part b: assume that the availble time is 480 minutes. Given the

Given the figure below, operation 4 represents a rework operation on parts that fail inspection upon completion of operation 2. a) How many units must the process start with in order to meet the required output of 5000 units? b) Given the information in the table below, how many machines are needed to perform each operation? Phase III: Determining total number of equipments F=AvailablemachiningtimeTotalrequiredtime=EHRSQ F= Number of machines required per shift S= Standard time (minutes) per unit produced Q= Number of units to be produced per shift E = Efficiency; actual production rate as percent of standard time H= Time of availability (minutes) per machine R = Reliability of machine (percent uptime=uptime/(uptime + downtime)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!