Question: answer question and provide assumptions Problem 3 ( 3 5 points ) The Dynaco Manufacturing Company produces a particular product in an assembly line operation.

answer question and provide assumptions Problem 3(35 points)
The Dynaco Manufacturing Company produces a particular product in an assembly line operation. One of the machines on the line is a drill press that has a single assembly line feeding into it. A partially completed unit arrives at the press to be worked on every 7.5 minutes, on average. The machine operator can process an average of 10 parts per hour.
a) Calculate the average number of units in the system (waiting and being serviced).
b) Calculate the average time a component spends in the system
c) If management wants to have its operators working 95% of the time. What must the assembly arrival rate be for the operators to be as busy as management would like.
 answer question and provide assumptions Problem 3(35 points) The Dynaco Manufacturing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!