Question: Answer questions 9 , 1 0 and 1 1 based on the case and data given in the following throughout a work week. In 4

Answer questions 9,10 and 11 based on the case and data given in the following
throughout a work week. In 480 ob sampling to an quality control operator. She makes 600 observations
in remaining 120 observations observations the operator performs quality control of a product, and he was idle
controlled totally 1600 parts. Mean Westinghing week, operator's total work duration is 40 hours, and he
this task.(Round up your result if necessanghouse rating is 1.25 for the operator, and 30% allowances are applied to
a.)48 seconds
b.)32 seconds
c.)15 second
d.)144 second
e)72 seconds
10.(5 points). Based on these data, what is the standard time for controlling one product (Calculate in seconds)?
a.)78 seconds
b.)52 seconds
c.)25 seconds
d.)92 seconds
e)117 seconds
11.(5 points). Is number of observations statistically sufficient for this study? (Based on 95% confidence level).
a) No, we have 480 observations on quality control, but need 600 observations.
b) Yes, necessary number of observations is 246, we have 600 observations.
c) No, we need to take 246 obervations more.
d) Yes, necessary sample size is 480, we have 600 observations.
e) None of them
12.(5 points) Remember multiple activity (gang) chart. Which data can be obtained by using a multiple activity
chart?
Utility level of workers
Utility level of machines
Quality of the product
Transportation flow directions
Flow of the process
a.)1 and 2
b.)1,2 and 3
c.)1,2 and 5
d.)3,4, and 5
e)1,4, and 5
(5 points) Which options are VALUE ADDED process steps?
B
?
 Answer questions 9,10 and 11 based on the case and data

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!