Question: answer sheet format: Updated with clearer images. For each network diagram, determine the length of each path, length of the critical path, and slack time


For each network diagram, determine the length of each path, length of the critical path, and slack time for each path. The numbers on the arrows or on the nodes represent expected activity times (weeks). a. ADA diagram 0. ADN diagram D. AON diagram c. AOA . Ch 17 / Paths Length of time Each path (weeks) / / C ritical Path (Put a*) Slack Time a / / / a. AOA / b. AON . AOA a. ADA diagram 04a Londo 7 6 ) ( NNN . AON diagram 3 4 ) 1 10 ( c. AOA nom @ _0_5_@ O 00_1