Question: Answer should be encoded. Design Problem: A proposed Diesel- electric generating power plant has an average daily load as shown. Design the plant taking into
Answer should be encoded.
Design Problem: A proposed Diesel- electric generating power plant has an average daily load as shown. Design the plant taking into consideration the following data. Municipal Load Industrial Load Time Load, kW 12 MN to 4AM. 500 4 AM to 8 AM. 800 8 AM to 12 NN 1200 12 NN to 5 PM 5 PM to 8 PM.. 1600 8 PM to 12 MN......... 700 * daily load from Monday thru Sunday Time 12 MN to 6 AM 6 AM to 2 AM 2 AM to 10 PM 10 PM to 12 MN. Load, kW 400* 1600 1300 400 1000 *daily load from Monday thru Saturday **Sunday load (Industrial) is at 400 kW for 24 hours Answer the following: 4. State how diesel power plant can be used as peak load plant? 5. Explain how diesel power plants are used for starting power plant. 6. State any FOUR advantages & disadvantages of diesel electric power plant. 7. Why the Two Strokes Engine more power produces than four-stroke engine
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts