Question: Answer the question below: 22.The annual demand for the ordinary face masks is 3600 units, ordering cost is RM20 per order, and the annual inventory

Answer the question below:

22.The annual demand for the ordinary face masks is 3600 units, ordering cost is RM20 per order, and the annual inventory carrying cost rate is 30% of the masks price of RM8. What should the order quantity be in order to minimize the total annual cost?

Select one:

A. Greater than 300 units but fewer than or equal to 350 units

B. Greater than 350 units but fewer than or equal to 400 units

C. Fewer than or equal to 250 units

D. More than 450 units

23.Kedai Runcit Serindahhas 2 cashier lanes that were staffed by acashierandbaggeron each lane. Checkout on these lanes takes only50 seconds. Assume that the lanes are always in use for 8 hours per day or one 1 shift and that a worker makes RM10/hour. In addition, the electricity costs is RM0.02per checkout while bagging material costs is RM0.15per checkout. What is the multifactor productivity for this system?

Select one:

A. 2.26 checkouts/RM.

B.2.22 checkouts/RM.

C. 2.25 checkouts/RM.

D. 2.28 checkouts/RM.

E. 2.50 checkouts/RM.

Answer the question below: 22.The annual demandAnswer the question below: 22.The annual demandAnswer the question below: 22.The annual demand
A company needs to rebalance a product layout for producing sweet sour lollipop wrap. The Following table describes the tasks involved in the production of this product. If the company is planning to operate 2 shifts per day, 8 hours per shift. If the desired output rate of the line is 2850 units per day, what is the cycle time? Work Time Immediate Element (seconds) Predecessor(s) A 12 B 19 A C 18 A 15 B 17 B, C 24 13 E 16 D, F Determine how many stations are required for the line to produce the desired output. Select one: O A. 6.0 workstations O B. 3.0 workstations O C. 5.0 workstations O D. 4.0 workstations O E. 7.0 workstationsPertubuhan Peladang Padang Serai Agent's Office has tracked fertilizer application and crop yields for a variety of pineapple seedlings. Their staff statistician, Mohd Rafizi has recorded the data shown in the following table and used the data to compute the performance of the fertilizer. Fertilizer Pineapple Seedlings 12 85 18 120 15 222 25 250 33 275 Use the data, identify the value of pineapple seedlings when fertilizer used is 58. Select one: O A. 453 seedlings. O B. 493 seedlings. O C. 488 seedlings. O D. 482 seedlings. 26 O E. 464 seedlings.A company is designing a product layout for a new product. It plans to use this production line eight hours a day in order to meet certain volume of projected demand. The tasks necessary to produce this product as shown in Table 1 below. If the projected output is 1200 per day, determine the efficiency of the production line that uses the minimum number of workstations. Table 1 Task Elements Predecessor Time (seconds) 22 20 A 18 monad B 20 28 DJE 52 29 Select one: O A. 95.24% O B. 87.91% Hide all C. 98.16% Top Hijab D. 88.88% Video E. 99.50%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!