Question: answer these 4 please, thank you so much 46 Which of the following is NOT a core idea of total quality management? A) employee empowerment
46 Which of the following is NOT a core idea of total quality management? A) employee empowerment B) leadership involvement C) cost reduction D) continuous improvement 47) W. Edwards Deming's Fourteen Points for Management include: A) use statistical methods to determine the workers responsible for poor quality. B) break down barriers between departments. C) the customer is always right, so design your system to please them. D) plan your work and work your plan. 48) A barbecue sauce producer sells their product in a 30 ounce bottle. Their historical process mean has been 30 ounces with a standard deviation of 0.25 ounces. If their tolerance limits are set at 30 ounces plus or minus 1.0 ounces, what is the process capability ratio of the bottle filling process? A) 1.00 B) 1.33 C) 2.00 D) 2.67 49) A barbecue sauce producer sells their product in a 24 ounce bottle. Their current process mean is 23.70 ounces with a standard deviation of 0.3 ounces. If their tolerance limits are set at 24 ounces plus or minus 1.0 ounce, what is the process capability index of the bottle filling process? A) 1.44 B) 1.33 C) 0.78 D) 0.89 50) The probability of accepting a lot with worse quality than the acceptable quality level is: A) the lot tolerance percent defective. B) the lot tolerance percent acceptable. C) the consumer's risk. D) the producer's risk
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
