Question: any help , thabk you Check my work Required information M4-10 to M4-12 Lakeside Inc. manufactures four lines of remote control boats and uses activity-based
Check my work Required information M4-10 to M4-12 Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. 13 Activity Cost Pools Machining Setup Quality control Estimated Total Cost Estimated Cost Driver $740,600 23,000 machine hours 112,475 550 batches 176,000 1,000 inspections es M4-12 (Algo) Assigning Costs Using Activity Proportions [LO 4-5) Suppose the Luxury boat requires 6,670 machine hours, 210 inspections, and 110 batches. Using activity proportions, determine the amount of overhead assigned to the Luxury product line. (Round your final answers to the nearest whole number.) Allocated Overhead Cost Pool Machining Setup Costs Quality Control Total Overhead $ 274,229 S