Question: AON Network Activity ID Duration Precedence A 2 None B 3 None C 2 A D 4 A,B E 4 C F 3 C G
AON Network Activity ID Duration Precedence A 2 None B 3 None C 2 A D 4 A,B E 4 C F 3 C G 5 D,E H 2 F,G Crash Cost Table Activity Max Crash Time Crash Cost A 1 $ 22,750.00 B 1 $ 34,000.00 C 1 $ 27,000.00 D 3 $ 49,000.00 E 2 $ 58,000.00 F 2 $ 30,500.00 G 2 $ 84,500.00 H 1 $ 19,000.00 Current Cost of the Project is $ 308,000.00 Question: 1. Draw the AON network and determine the ES, EF, LS, LF, and SL. 2. Determine the current project length. 3. Crash the network as far as it can go and determine the cost for each time period crashed 4. Determine the final project cost