Question: AP Calculus Unit 5 -5.4a Optimization Problems Please show your work 1. A bicycle manufacturing company has determined that the total cost of producing an


AP Calculus Unit 5 -5.4a Optimization Problems Please show your work 1. A bicycle manufacturing company has determined that the total cost of producing an bike is given by the equation, C = 8x2 176x + 1800, where Xis the number of bicycles per minute the company makes. How many bikes should the company manufacture per minute to minimize the cost? 2. Elon Musk fires a rocket into the air, and its height in meters at any given time, t, can be calculated using the formula Mt) = 1600 + 196t 4.9t2. Find the maximum height of Elon's rocket and the time at which the rocket reaches that height. 3. A swimmer is at a point 500 meters from the closest point on a straight shoreline. She needs to reach a cottage locate 1,800 meters down shore from the closest point. If she swims at 4 m/s and walks at 6 m/s, how far from the cottage should she come ashore so as to arrive at the cottage in the shortest time? 4. A 384-square-meter plot of land is to be enclosed by a fence and divided into two equal parts by another fence parallel to one pair of sides. What dimensions of the outer rectangle will minimize the amount of fence used
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
