Question: arch Problem #2. (8 points) RC Corp. uses a job order cost accounting system. During the month of April, the following events occurred:. a.
arch Problem #2. (8 points) RC Corp. uses a job order cost accounting system. During the month of April, the following events occurred:. a. Raw materials requisitioned: Job 1: $4,200, Job 2: $7,500, b. Assigned the factory payroll to jobs and overhead. Job 1:$7,000, Job 2: $9,800, c. Overhead was assigned at a rate of 50% of direct labor cost. Required: Determine the total cost of each job. Job Cost Sheet Job 1 Direct Materials Total Job Cost $ Direct Labor Job Cost Sheet Job 2 Applied Direct Direct Overhead Materials Labor Applied Overhead F Total Job Cost $ 38% Foon
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts