Question: As a Geotechnical Engineer at a road construction project, the student must develop thepreliminary sidehill cut design as shown in the image below, considering the

As a Geotechnical Engineer at a road construction project, the student must develop thepreliminary sidehill cut design as shown in the image below, considering the different conditioningfactors, verification tests and requirements that he/she considered to be associated to ageotechnical work of this nature. As can be seen in the image below, the natural terrain height isof +11,5 meters while that at which the road platform will be built on, is of +3,5 meters. It is theengineers responsibility to determine the sidehill cut angles with the horizontal line, as well as itsbase width according to his/her engineering and design criteria.As it can be observed, the phreatic level is 2 meters below ground surface level.The terrain parameters are:Clay:E =35,00 MPa ; =0,2 ; c =25 kPa ; =25 ; sat =20 kN/m3 ; d =16 kN/m3 ;G =2,7 ; e0=0,7 ; cu = su =70 kPa ;Rock:The rock is Massive and sound; width values are unknownRMR =90 ; E =4500 MPa ; =0,2 ; c =1,3 MPa ; =45 ; =24 kN/m3

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!