Question: As shown below, a PV module operating under STC is connected to a load ( load resistance R = 2 0 ) via an MPPT
As shown below, a PV module operating under STC is connected to a load load resistance via an MPPT based on a boost DCDC converter. The module specifications are as shown in the exam cover page. The boost converter operates from an initial duty cycle of and an iteration step of
Determine the number of steps required to reach MPP using the hill climbing algorithm and the final duty cycle error in
Hint: for a boost converter,