Question: ask an expert 4 . A maintenance planner would like to plan the mechanical maintenance activities over the following planning horizon. Assume that we have

ask an expert 4. A maintenance planner would like to plan the mechanical maintenance activities over the following planning horizon. Assume that we have three time periods with maintenance loads of 300,250, and 350 hours of grade 1 work, and 100,50, and 150 hours of grade 2 work, respectively. The in-house regular capacity is 200,350, and 300 hours for periods 1,2, and 3 respectively. The overtime capacity is at most \(25\%\) of the in-house capacity.
Subcontracting is abundant, and technically, there is no limit on this source. The cost of performing one in-house man-hour is taken to be 1 unit cost, an overtime man-hour costs \(50\%\) more than this regular time, i.e.,1.5 cost units, and the sub-contracting costs 2 cost units. Backlogging of one man-hour costs 0.3 unit cost.
a) Develop the maintenance plan and calculate its corresponding cost.
b) Formulate the maintenance plan that satisfies the following constraints, and find its minimum-cost solution:
- All grade 2 work should be met by regular in-house crafts as much as possible.
- If it is not possible to satisfy grade 2 work by regular in-house crafts, use overtime.
- No backlog is allowed for grade 2 work.
- The priority 1 work could be met with overtime or sub-contract maintenance.
ask an expert 4 . A maintenance planner would

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!