Question: Assessing control risk at below the maximum level most likely would involve: Performing more extensive substantive tests with larger sample sizes than originally planned.

Assessing control risk at below the maximum level most likely would involve:

Assessing control risk at below the maximum level most likely would involve: Performing more extensive substantive tests with larger sample sizes than originally planned. O Reducing inherent risk for most of the assertions relevant to significant account balances. O Changing the timing of substantive tests by omitting interim-date testing and performing the tests at year-end. Identifying specific internal control structure policies and procedures relevant to specific assertions.