Question: Assessment 4 - Project Task Geotechnical Design Student Information Your task. Geotechnical Design For the following Activity you are required to provide 2 geotechnical designs

Assessment 4 - Project Task Geotechnical Design Student Information Your task. Geotechnical Design For the following Activity you are required to provide 2 geotechnical designs solutions for the foundation in Task 1 and Task 2. In the following tasks will you will be provided with the information and design of a Commercial Factory on a given site. Use the information and data to provide to different geotechnical designs for the foundation of the factory. You will be communicating with your Supervisor, colleagues and contractors throughout the work activities. You will review your design with the Supervisor to obtain feedback with your design and make changes where required. Once you have completed you preliminary design you will be required to submit it to your Supervisor for approval. At the close out of the task you will participate in a performance review with and independent expert, your colleagues and Supervisor and obtain feedback and verification of the design work produced. Task 1 (occasion 1) Strip footings: 600d x 400w concrete with 4-12TM steel reinforcement top and bottom, 6 diameter ligatures at 750 centres, minimum 40 cover over steel. Footings extended beneath portal columns minimum 250 beyond base plate on all sides and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!