Question: Assignment: 1. Job No. 22567 Two king sized Bed order will require material of 7 feet by 5 feet OAK wood. The wood will cost

Assignment: 1. Job No. 22567

Two king sized Bed order will require material of 7 feet by 5 feet OAK wood. The wood will cost 10tk per Sqr.Feet. The labor hour those will take is 8 hours each and the per hour cost for labor is 15 tk. The Company estimate that the total Manufacturing Overhead for the period is 6,40,000 tk. and the total estimated hours the production will continue is equal to 20,000 hrs.

2. Job No. 65580

A dressing table order will require material of 60 sqr.feet Keroshin wood. The wood will cost 6 tk per Sqr.Feet. The labor hour those will take is 4 hours each and the per hour cost for labor is 10 tk. The Company estimate that the total Manufacturing Overhead for the period is 12,40,000 tk. and the total estimated hours the production will continue is equal to 1,20,000 hrs.

Instructions: Prepare Job cost sheet for both the Job orders. Also prepare supplementary sheets for Material requisition and labor requisition as well. You can use MS word file to create the table or may use the MS excel. If using excel please make all the sheets in one MS excel file. you can not upload more than one file in the submission.

*Please show step by step, Thank you.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!