Question: Assignment 3 ( four - level ) concrete building to be The subject of the following exercises is a three - story ( for used

Assignment 3(four-level) concrete building to be The subject of the following exercises is a three-story (for used as a public garage in Frankfort, Kentucky. The next plan represents a typical level. Other details follow (see Figure).
The floor will be made of 8n-t-thick one-way suspended slabs, 12''20n beams (in the short direction), and 20''30'' girders (in the long direction).- Suspended slabs rebars:
The floor-to-floor gross height will be 15'.- The ground floor has a 6- "thick slab on grade with a 4''4''W4W4 wire mesh reinforcing and a 0.0006-t-thick polyethylene vapor barrier.
Use wood shores for slabs and beams. Formwork 1 ill be used four times. The steel grade is 60. Therete minimum compressive strength is 3,500 and will be placed by
pump for all members. - Assume reasonable concrete cover for rebar. State any other assumptions you have to make.
Estimate the bare cost for providing and installing the suspended slabs. 3. Estimate the bare cost for providing and installing the (small) beams. 4. Estimate the bare cost for providing and installing columns.
For questions below, use the following:
A. RSMeans total incl. O&P
B. RS means total bare cost plus labor add-ons and 10 percent of all expenses for
overhead and profit. Check your answers by changing markups in RSMeans Online
estimating, Advanced Report.
Estimate the total cost, including overhead and profit, for providing and installing
the suspended slabs.
Estimate the total cost, including overhead and profit, for providing and installing
the (small) beams.
Estimate the total cost, including overhead and profit, for providing and installing
the columns.
Estimate the total cost, including overhead and profit, for providing and installing
the footings.
Submission Instruction:
Convert everything into a single PDF file. If you use Excel, please also convert
excel to pdf. Please combine everything into a single pdf file.
You must provide the RSmeans data downloaded from BCCD so can know
what unit price you will use.
Please provide the procedures for how you calculate. Only providing a single
final number for the total cost is not appropriate.
Assignment 3 ( four - level ) concrete building

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!