Question: ASSIGNMENT 4 : OPERATIONS MANAGEMENT 2 ( PRB 2 6 0 S ) QUESTION 1 The results of a time study to perform a quality
ASSIGNMENT : OPERATIONS MANAGEMENT PRBS
QUESTION
The results of a time study to perform a quality control test are shown in the following table. On the basis of these observations, determine the normal and standard time for the test, assuming a allowance factor.
QUESTION
A total of observations of an assemblyline worker, were made over a hour workweek. The sample also showed that the worker was busy working assembling parts during observations.
a Find the percentage of time Bob was NOT working.
b If you want a confidence level of and if pm is an acceptable error, what size should the sample be
c Was the sample size adequate?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock