Question: Assignment: Complete the first stage of your Group ProjectThe Validate Scope Process. To validate scope, your company requires five interim inspections and one final inspection.

Assignment: Complete the first stage of your Group ProjectThe Validate Scope Process. To validate scope, your company requires five interim inspections and one final inspection. The inspections are: Grading inspection; pre-slab and underground plumbing stake-out (completed) Slab mspectlon pre-framtng plan (mmpleted} Drywall inspection; pre-cabinets and fixtures Cabinets and fixtures inspection Final (closing) inspection Gty b Group Project, Part | (Module 2) - Work together with your team to prepare a validate scope document for the framing and exterior inspection, pre-drywall inspection. This inspection includes the following: Completed exterior, including roof, windows, doors (pre-painting) Completed internal wall framing In-wall plumbing for sinks, tubs, dishwasher, clothes washer, wet bar, etc. Completed electrical for wall switches, outlets, ceiling fixtures, etc. Low-voltage wiring and conduit for security system, AV equipment, internet and computer wiring, thermostat, telephones, etc. HWVAC ducts and returns All of these items are shown on the construction plans approved by the Browns. If the items are as shown on the plans, they should be approved. The Browns know that if they want to make any changes not shown on the plans, they will be charged a lump sum of $250 for making the change and any additional costs incurred to construct the change. Some changes may require the review and approval of the local building department, which will add at least two weeks to the construction schedule. You don't anticipate any issues; the Browns live in the area and stop in at the site once or twice each week. You have shown the location of various appliances and the kitchen island by painting the outline of these on the floor. This allows for the owners to better visualize the final layout. The purpose of this week's submission is for your team to develop a generic procedure that uses the inputs, tools, and techniques, and produces the outputs in the Validate Scope process. In addition, your team must develop a quality control procedure for just the electrical switches and outlets to eliminate rework and demonstrate your knowledge of the core value of Responsible Stewardship by installing these features correctly the first time. Remember the carpenter's adage: \"Measure twice, cut once.\
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts