Question: Assignment: Concrete ( Medical Office ) Instructions Use 1 2 - point Times New Roman Font with Single Spacing Perform the takeoff using On Screen
Assignment: Concrete Medical Office
Instructions
Use point Times New Roman Font with Single Spacing
Perform the takeoff using On Screen Takeoff and Excel
Submit your assignment in both Excel and as a OST Bid Package
This assignment is to be completed individually
Submit your assignment through Canvas
Late submissions will be accepted till the end of the semester for a grade deduction.
No handwritten solutions will be accepted.
File naming format: Last Name, First NameConcrete
The assignment is valued at possible points.
Show all calculations and formulas, state all assumptions.
Failure to follow instructions will result in deductions
Assignment Instructions
For the Banner Health Medical Office Building drawings provided, calculate the total CY of concrete needed for:
a All continuous footings
b All spread footings
c All slabs
Note Consider two steps for the step footing.
Make sure your calculations are neat, organized and easy to follow. Show all your work.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
