Question: Assignment: Examine the provided document CPT125 NYPD Engineering Security Appendix A.pdf. Then, calculate the Risk Tier for the hypothetical building described here. Complete the RISK

 Assignment: Examine the provided document CPT125 NYPD Engineering Security Appendix A.pdf.

Then, calculate the Risk Tier for the hypothetical building described here. Complete

Assignment: Examine the provided document CPT125 NYPD Engineering Security Appendix A.pdf. Then, calculate the Risk Tier for the hypothetical building described here. Complete the RISK TIER WORKSHEET below and submit the document by using Blackboard. The hypothetical building: This building, occupied by a nationally recognized industrial company, has been the target of specific threats in the past. It stands alone in with a 350 foot perimeter all around. Access to and from the building is controlled by guards at the entry, and automobiles are not permitted within 300 feet. The building as moderate ability to withstand an explosive charge. This is a tall building with 35 stories, and 11,275 people work in the building. Only the local and regional economies would be affected if an attack was to occur, and the impact on it would be less than $500,000,000. A subway station with one set of tracks is located below the building, and otherwise the building stands far from other significant infrastructure. RISK TIER WORKSHEET Step One: For each sub-factor, list the value (1-3) that most accurately describes your building. Sum sub-factor scores to determine factor ratings. Threat Threat Rating: - Threat Profile 1: Limited 2: Moderate 3: Significant Target Attractiveness 1: Limited 2: Moderate 3: Significant Vulnerability Vulnerability Rating: - Adjacency 1: Limited 2: Moderate 3: Significant Accessibility 1: Limited 2: Moderate 3: Significant Structural Performance 1: Limited 2: Moderate 3: Significant Impact Impact Rating: Maximum Occupancy / Height 1: Limited 2: Moderate 3: Significant Economic Criticality 1: Limited 2: Moderate 3: Significant Transportation Criticality/Proximity 1: Limited 2: Moderate 3: Significant Critical Infrastructure Proximity 1: Limited 2: Moderate 3: Significant Threat x Vulnerability x Impact - Risk Score Risk Score: ------------ --------- Step Two: Multiply the factor ratings to arrive at the final risk score. Step Three: Determine the building's NYPD Risk Tier using the tier table. Risk Score 288 - 648 198 - 287 120 - 197 80 - 119 24 - 79 NYPD Risk Tier High Medium / High Medium Low / Medium Low NYPD RISK TIER: Assignment: Examine the provided document CPT125 NYPD Engineering Security Appendix A.pdf. Then, calculate the Risk Tier for the hypothetical building described here. Complete the RISK TIER WORKSHEET below and submit the document by using Blackboard. The hypothetical building: This building, occupied by a nationally recognized industrial company, has been the target of specific threats in the past. It stands alone in with a 350 foot perimeter all around. Access to and from the building is controlled by guards at the entry, and automobiles are not permitted within 300 feet. The building as moderate ability to withstand an explosive charge. This is a tall building with 35 stories, and 11,275 people work in the building. Only the local and regional economies would be affected if an attack was to occur, and the impact on it would be less than $500,000,000. A subway station with one set of tracks is located below the building, and otherwise the building stands far from other significant infrastructure. RISK TIER WORKSHEET Step One: For each sub-factor, list the value (1-3) that most accurately describes your building. Sum sub-factor scores to determine factor ratings. Threat Threat Rating: - Threat Profile 1: Limited 2: Moderate 3: Significant Target Attractiveness 1: Limited 2: Moderate 3: Significant Vulnerability Vulnerability Rating: - Adjacency 1: Limited 2: Moderate 3: Significant Accessibility 1: Limited 2: Moderate 3: Significant Structural Performance 1: Limited 2: Moderate 3: Significant Impact Impact Rating: Maximum Occupancy / Height 1: Limited 2: Moderate 3: Significant Economic Criticality 1: Limited 2: Moderate 3: Significant Transportation Criticality/Proximity 1: Limited 2: Moderate 3: Significant Critical Infrastructure Proximity 1: Limited 2: Moderate 3: Significant Threat x Vulnerability x Impact - Risk Score Risk Score: ------------ --------- Step Two: Multiply the factor ratings to arrive at the final risk score. Step Three: Determine the building's NYPD Risk Tier using the tier table. Risk Score 288 - 648 198 - 287 120 - 197 80 - 119 24 - 79 NYPD Risk Tier High Medium / High Medium Low / Medium Low NYPD RISK TIER

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!