Question: ASSIGNMENT ONE A work item in a Bill of Quantities is in - situ blinding concrete C 1 5 ( 1 : 3 : 6
ASSIGNMENT ONE
A work item in a Bill of Quantities is insitu blinding concrete C :: with mm aggregate in structural foundations. The volume of concrete to be provided is and the method of construction involves site machine mixing. Assume hours working day for plant and gang and for wastage and shrinkage of materials. Assume profit and overhead. The market prices for the materials, labour and plant as well as the plant and labour outputs are as follows:
tableOutput: Site machine mixing,mbatchMixing cycle of mixer, minutesOperating efficiency of mixer,Allinplant rate for concrete mixer,,Poker vibrator allinrate,GH One Gang,,tabletwo mason oneoperator labourersOutput for unloading and stacking of cement bagsCost of m of sand exsite GHCCost of m of aggregate exsite GHCCost of bag of cement exsite GHCm of cement,, bagsAllinrate wage of a tradesmen per day, GHCAllinrate wage of a labourer per day, GHzeta
Calculate the following:
i Total material cost for concrete
ii Number of plant days
iii Concrete production per day
iv Number of bags of cement required for concrete production in a day,
v Plant cost for the concrete
vi Total labour cost for concrete
vii Total cost for concrete including profit and overhead
viii Unit Rate unit cost per
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock