Question: Assume that Angler industries allocates overhead using o plantwide overhead rote bosed on machine hours. How much total overheod will be assigned to a product
Assume that Angler industries allocates overhead using o plantwide overhead rote bosed on machine hours. How much total overheod will be assigned to a product that requires 1 direct labor hour and 4.20 machine hours in the Assembly. Department, and 5.00 direct lobor hours and 0.4 machine hours in the finishing Department? Multiple Choice 52770 52350 5920 32400 \\( \\$ 18.00 \\) Assume that Angler industries allocates overhead using o plantwide overhead rote bosed on machine hours. How much total overheod will be assigned to a product that requires 1 direct labor hour and 4.20 machine hours in the Assembly. Department, and 5.00 direct lobor hours and 0.4 machine hours in the finishing Department? Multiple Choice 52770 52350 5920 32400 \\( \\$ 18.00 \\)