Question: At a potential hydraulic - plant site the average elevation of the headwater is estimated at 5 5 2 . 5 m , the tailwater
At a potential hydraulicplant site the
average elevation of the headwater is estimated
at the tailwater elevation at
The average annual water flow was determined to
be equal to that volume flowing through a
rectangular channel wide with a depth of
and an average velocity of
Find the annual electrical energy this site can
produce with a water turbine efficiency of
a generator effeciency of and the loss in
the headworks equal to of the available head.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
