Question: At a potential hydraulic - plant site the average elevation of the headwater is estimated at 5 5 2 . 5 m , the tailwater

At a potential hydraulic-plant site the
average elevation of the headwater is estimated
at 552.5m, the tailwater elevation at 480m.
The average annual water flow was determined to
be equal to that volume flowing through a
rectangular channel 9.15m wide with a depth of
1.22m and an average velocity of 4.57msec.
Find the annual electrical energy this site can
produce with a water turbine efficiency of 85%,
a generator effeciency of 95%, and the loss in
the headworks equal to 316 of the available head.