Question: Average setup time on a certain production machine is 6 . 0 h r . Average batch size is 4 0 parts, and average operational

Average setup time on a certain production machine is 6.0hr. Average batch size is 40 parts, and average operational cycle time is 2.5 min. The reliability of this machine is characterized by mean time between failures of 40 hr and a mean time to repair of 35 min
 Average setup time on a certain production machine is 6.0hr. Average