Question: ( b ) Along the irrigation network, it is planned to construct a gate for better management of the water. If the gate is 7

(b) Along the irrigation network, it is planned to construct a gate for better management of the water. If the gate is 7 m , the flow in the channel is 9.5m3s and the slope of the channel is 0.002. Estimate the horizontal distance from the gate, where the backwater effect induced by the gate will be recorded.
[15marks]
( b ) Along the irrigation network, it is planned