Question: b False MIM as a predetermned motion ne sysm stands fo a Methodds Time Measurement c Motion Time Measuement b. Model Test Model d. Mark

b False MIM as a predetermned motion ne sysm stands fo a Methodds Time Measurement c Motion Time Measuement b. Model Test Model d. Mark to Market is a measure of equipment reliabdity and is defined as the equipmment is available to run relative to the total time it could be used. 7 peoportion of time a. Available time Actual working time b. Efficiency d. Availability 8. In worker process chart, one of the following t is not used NO a. d. b. 9. The reciprocal of demand rate of a given product adjusted for available shift time in the factory is: c. Standard time Cycle time a. d. Takt time b. Normal time 10. One of the following is false about time study a. Standard data system could be used to set standard times before the production starts. b. Predetermined motion time system could be used c. Both direct time study and work sampling, require an initial performed study d. Standard data system's time could be represented using formulas, tables or charts. to direct time study input as an to start the full one
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
