Question: ( b ) Further down the watercourse, an engineer is commissioned to manage flooding. They propose a simple compound channel, in place of the existing

(b) Further down the watercourse, an engineer is commissioned to manage flooding. They propose a simple compound channel, in place of the existing floodplain and channels, see sketch Figure Q1b. This channel section slopes at a 1.5 m elevation drop every 1 km . Channel side slope ratios are shown y:x.
(iii) Determine the maximum flow rate that could be conveyed in this compound channel.
(iv) Discuss the accuracy of the discharge estimate from Q1b(i). Where else within the engineer's design calculations could there be uncertainty; why does this arise, and what could be done to improve the accuracy of these calculations?
( b ) Further down the watercourse, an engineer

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!